• 27
  • Dec

Water Treatment Plant Work at the Presidential Palace

Location:

Merdeka Palace, Jakarta

Cipanas Palace, West Java

System: Conventional WTP, Solar Panel System, BWRO System, Ultrafiltration System

Capacity:

Conventional WTP; 5 Liters per second

Ultrafiltration; 9.5 Liters per second

BWRO; 4.5 Liters per second

Solar Panel; 20 kW

Scope of Work: Civil Works Operational Building, Water Treatment Plant, SCADA System, Piping Network, Water Fountain & Dispenser Installation, and Solar Panel

Share This
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare