Instalasi Pengolahan Air Mandalika

Lokasi: Pullman Hotel Mandalika, Nusa Tenggara Barat

Sistem: Membran Reverse Osmosis (RO)

Kapasitas: 10 m3 per jam

Lingkup Pekerjaan: Sistem Instalasi Pengolahan Air, Sistem SCADA dan Jaringan Perpipaan

Share This
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare